
REMKO – strong as a bear. Propane – Heater REMKO PGT 30 – PGT 100 Edition GB– L07 Operation Technology Spare Parts
10 Drawing PGT 60 We reserve the right to make modifications in dimensions and construction in the interests of technical progress.
11 List of spare parts PGT 60 Fig.-No. Description EDV-Nr. 1 transport handle 1101142 2 outside casing 1101420 3 insulation 1101421 4 co
12 Drawing PGT 100 We reserve the right to make modifications in dimensions and construction in the interests of technical progress.
13 EDV-No. 1101691 1101188 1101267 1101320 1101019 1101018 1101192 1101134 1102906 1101692 1101366
14 Block Diagram PGT 30/60 I – ionisation electrode KL – terminal strip M – fan motor MV – solenoid valve
15 Series PGT 30 PGT 60 PGT 1
REMKO GmbH & Co. KG Klima- und Wärmetechnik D-32791 Lage • Im Seelenkamp 12 D-32777 Lage • Postfach 1827 Telefon (0 52 32) 606 - 0 Telefax (0 52
2 Contents Page Safety hints 3 General hints
3 Safety Hints When using this unit make sure always to observe the applicable building and fire protection regula-tions as well as the rules of the
4 Starting Make sure to charge a person with the operation of the unit and with the supervision of the reservoirs and of the bottle stock who has bee
5 Close all the bottle valves. Let flame burn out. The fan should still run for a few se-conds to exhaust the accumulated heat. Putting out of Servi
6 Maintenance Depending on the operation conditions the units are to be tested by an expert when necessary, but at least re-gularly every two years,
7 Action in the Case of Faults - Unit does not start - Unit switches off during operation (fault-indicating lamp in automatic burner is li
8 We reserve the right to make modifications in dimensions and construction in the interests of technical progress. Drawing PGT 30
9 List of spare parts PGT 30 Fig.-No. Description 1 transport handle 2 outside casing 3 combustion chamber 4 end plate, front 5 bl
Komentáře k této Příručce